How to build a screen porch – Howard County, Maryland

Posted on July 21, 2017 By

The idea is simple really first we design a project and then we build it the first part of any project is to set the deck elevation as well as well polls reporters once also been done need to make sure there are no next year those groups that will cause problems with the ledger once that is the chief we start to cut away the sightings of the installed question once all sightings been cut away you can begin to install flashing in the areas with us anymore was you can see watching installed proposed that has been removed it’s PVC pipe being it’s coming out the future opposed it and here we have holds a proper question in store for the entire day once the project is blacks we can begin to install our letter which is attached to the house with nails and also with half-inch blacks here’s a of those pictures are probably being runs through the pressure treated like to point what’s alleged been installed we begin to sexual east temporarily with different pieces of withholding it elevation you’re more joystick typically tend three to four choice so that we can change the level we continue to do this with higher taxes completely temporary thing once the decade contention that here the fine tune it with a level to make sure that everything has a precise little bit once we have our level which he you begin to install the few weeks throughout the entire day once all of the two weeks for installed the chart one more time to level and we begin to install the six by six pressure treated columns the most important part of installing the six by six columns is that their level him directly the us after all the six by sexism been installed review one final check with the local sure everything was perfect do you have a picture of all of the six point six percent for the column stoltenberg be back what sort that is completely fremd we can begin I think that the project words old walls reports in this instance we’re still the walls the porch first following local building codes we connect all for by force to protect below and the pinochle with simpson’s strong I can actors for immigrants three supreme court reinstalled late final post’s newsroom for but for pressure fourteen inch go beyond is installed here it’s been more than fall battlefields tipped off to vote for mister hope to achieve a perfect well fiberglass screen is installed above the jury’s and the need for decades to create insect free environment once the screen has been installed we put the taking on top we installed a decade with color matching stainless steel screws on top of the fibers last spring once all of the decade has been installed we can continue with our posts and start to build the roof once all the four by four police have been installed in the white mountains whose lives have been installed we begin to square the deck to make sure that the roof is completely here you see the to buy eight beans being installed on top of a four-by-four pressure treated posts he can see that the teams are completed and ready for the roof there is bracing materials keeping the entire project and square here we have the deck completely framed the taking its toll all four by four police installed all the teams ready for the roof the first step in building the roof mister conaway the citing machine once all of the sightings been cut away from the house the house is properly flashed we begin to install the rafters we continue installing rafters on either side of the main themes so that everything supported correctly here we have the cable roof on the right side complete and ready for the plywood insulation once the rafters of been installed we could put the plywood on top we used a decorative she won eleven plywood at brandeis does that appeal on the inside in this picture you’ll see the shuttle roof on the left side this almost completely free once the rafters have been installed the decorative he won eleven plywood is installed we installed half-inch the west be so that the e mails from roofing not true here’s another picture of the plywood the roof being installed and here we have the entire roof completely framed and ready for the shingles to be installed after the decade has been installed and while the roof is awaiting shingles you begin to install we continue installing the vinyl camera system around the entire project need openings where the future stairs woke up after the asphalt shingles have been installed on the roof we begin to trim the beams and install the sock that because underneath yes here you can see the saw fit continuing around the roof of the project he can see that the trim material on the sock that around the group has been complete and we’re beginning trend the freemen back in this picture you’ll see the all the fish material on the deck has been completed after the roof has been trimmed in the famous that has been trimmed the move on to the truth after all the trend has been installed begin to applied lattice underneath of the deck once the deck is been framed in trend we begin to work on the patio after the pad is laid out start to build our friends what’s called the friends are out there we have a foundation for the patio we begin to for the country we continue to pour the country throughout the entire patio inside the form once the concrete is been formed we level everything off using it to vote for here you can see the country continued to be formed unlawful we continue to pour in the whole the country and so the actual places in chief through the patio is almost completely port once the entire patio has been word and level we do over one last time to create a smooth surface this is the first step in calling distant country patio first we apply is a scholar we continue to apply that a scholar and so the entire patio it’s completely once the patio has been poor level of a scholar applied we used the decorative concrete stamps to create the Dominican sleep patterns here we continue to stamp the concrete patio here the stamp concrete process is nearing completion in you begin to see the patterns emerge in this picture you’ll notice rebar coming up to the patio this will support the future sitting law that will be installed once the stamp concrete process is complete we go over the entire patio with a sealer that at scholar and also protects it from the elements here we continue to seal the ideal can tell the difference between the sealed portions in the council here we have our decorative sitting Wall ready for the flax don’t talk back this picture shows the completed patio along with the city walls blackstone installed on top once the entire patio process has been complete we can go back to the screen porch and begin to install all of the streets after the deck is been completed the idea has been completed and we’ve installed all the screens we go back and clean the project is one side the entire yard that might have been damaged during the building process in addition to clean the project outside in the yard we typically install more that’s around the perimeter I had for a nice details as well as future flower locations and are finished product we have comedians free screened porch the cable roof on the right side interpreter have you around the perimeter sitting Wall for action entertaining states in a nice clean cited yard

As found on Youtube

Add A SunroomSunroom AdditionSunroom Design     , , , , , , , , , , , , , , , , , , , ,